Pages: [1]
FalconFly
BAM!ID: 9744
Joined: 2006-10-19
Posts: 41
Credits: 0
World-rank: 0

2006-10-19 21:16:23
last modified: 2006-10-19 21:17:40

It shows the "Projects accumulated" RAC, which is the one also shown in the detailled stats, but has no meaning IMHO.

If e.g. joined on 2 Projects with 1000 RAC each, at least in the Sig it should nothing else than the sum of RAC (2000 in this example)

As it is now, it shows the correct individual RAC per Project, but the total RAC doesn't add up when viewing it.

Would it be possible to use the sum of all RAC ?
(which strangely also doesn't fit the "According to BOINCstats" RAC)
Pages: [1]

Index :: BOINCstats Bug Report :: Stats Sig Graphics wrong (RAC)
Reason: