Willy,
Looking at my
detailed stats, my daily credit pie chart is funky.
This seems to be because several days ago CPDN Beta points where exported to CPDN, but due to technical dificulties they were removed yesterday. Meaning very large negative credit on a project (Not a split cpid).
In all truth this seems to have exposed several potential weaknesses in the code. Particularly, the incremental update showed me up by over 4,000 credits before dropping over 3,000 on the daily update (CPDN only droped by 3,958). Also, the target credit was calculating a date in November of this year before the daily update, but after it is now calculating a date in 2011 (I believe it is ten times as long), I doubt it will take more than two years to make up the nearly 4,000 credits that I lost yesterday (RAC 800's, BsRAC700's).
Also, as a side note UCT seems to be everywhere except the detailed stats for users.
Thanks for everything.
P.S. I do realize that by the time you read this and check my stats the daily update may have occured and the offending image will be lost, but trust me it's funky. I can send you a copy if you would like.
This signature was stolen from somewhere.
